23 · Launch
Week 24 · 25 hours
Objective
Run a launch that actually sells a meaningful share of the run, with a plan rather than a hope.
Why it matters commercially
Launch is not a day; it’s a sequence. Brands that “launch” by posting once and waiting sell nothing. The mechanics below are unglamorous and they work.
Core concepts
The launch sequence
| Phase | Timing | What happens |
|---|---|---|
| Build | Weeks −8 to −2 | Process content, list building, sample teasers, stockist conversations |
| Announce | Week −2 | Date, price, quantity, sizes announced. Waitlist push |
| Early access | Day −2 to 0 | The list buys first. Honour this precisely — it’s why they joined |
| Launch | Day 0 | Public. All assets live |
| Sustain | Day 1 to 30 | Content continues, reviews collected, stockists announced, press follow-up |
| Tail | Month 2+ | Restock notices, size-specific pushes, events, second-wave content |
What to actually publish
You have something almost no new brand has: six months of documented process. Use it.
- The teardown photographs from Module 2
- The taped last and the flattened mean forme from Module 4
- The first sample and what was wrong with it, honestly
- The comment sheet, redacted if needed
- The factory, named, with photographs if they permit
- The cost reality, if you’re comfortable — a genuine cost breakdown is rare and gets shared
- The wear test
This material is more interesting than a lookbook, and it does the specific job a new brand needs done: establishing that you know what you’re doing.
Press and seeding
Realistic at your scale:
- Small independent publications and newsletters covering footwear, design or your local scene. They’re accessible, they reply, and their readers actually buy. Pitch with a physical sample offer, not a press release.
- Individual writers, not publications. Find who covered a comparable small brand and email them personally.
- Seeding pairs to 5–10 people whose taste is credible in your space. Not follower counts — taste. Give them the shoe, no obligation, no contract. Some will post, some won’t. The ones who do are worth more than paid placements.
- Not paid influencer campaigns. At your budget the money is better spent on inventory or better photography.
Budget 10–15 pairs of your run for seeding and press. That is a real cost — model it as such, not as free.
Paid advertising
Honestly: at a $10k total budget and 250 pairs, paid acquisition is usually the wrong call. A first-time brand’s cost per acquisition on Meta commonly exceeds the contribution margin on a single-SKU footwear product with no repeat purchase yet.
If you test it, do so with a hard cap ($300–500), a single clear objective, and stop it the moment cost per acquisition exceeds your contribution margin. Don’t learn advertising and footwear manufacturing in the same quarter.
Launch-day operations
The unsexy checklist that determines whether launch day goes well:
Selling out is not the goal
The goal is a healthy sell-through at full price with happy customers, and enough cash to fund V2. Selling out in an hour at 250 pairs means you underpriced or under-produced — which is a fine problem, but don’t engineer artificial scarcity to fake it. Your scarcity is real; say the real reason.
Do this
1 · Launch plan (4h). A dated sequence, phase by phase, with the exact assets required for each and the day each goes live.
2 · Content bank (8h). Prepare the entire launch-window content set in advance — process posts, product posts, the founding story, the FAQ. Do not plan to make content during launch week; you’ll be answering emails.
3 · Press list and pitches (4h). Twenty individual writers/newsletters. Personalised emails, sample offer, sent in the announce week.
4 · Seeding list (2h). 5–10 people. Sizes collected in advance. Pairs reserved.
5 · Operational dry run (4h). The full checklist above. Actually test the return flow. Actually place a test order.
6 · FAQ and support templates (3h). Sizing, shipping times, returns, materials, restocks, “when’s the next colour.”
Deliverable. A dated launch plan; a complete pre-made content bank; twenty personalised press pitches sent; a seeding list with pairs reserved; a completed operational dry-run checklist including tested return and exchange flows; an FAQ and support templates.
Self-check
- What are the six phases of a launch sequence?
- What content do you have that almost no new brand has?
- Why seed for taste rather than follower count?
- Why is paid advertising probably wrong for you right now?
- What must be tested before launch day?
Traps
Launching without a list. If you get to Week 23 with no email list, delay the launch and spend four weeks building one. Launching to nobody wastes the drop.
Making content during launch week. You’ll be doing customer service. Bank it in advance.
Fake scarcity. Your scarcity is genuine. Manufactured urgency from a brand nobody knows reads as desperation.
No plan for the tail. 60–70% of your run sells after launch week. Plan that period as deliberately as the launch.