12 · Vetting, Negotiating & Terms

Weeks 11–12 · 25 hours

Objective

Choose a manufacturer you can trust with your money, and agree terms that protect you — without the leverage of volume.

Why it matters commercially

You are about to send a stranger, probably on another continent, a meaningful fraction of your total capital. The cost of getting this wrong is not a bad shoe; it is losing everything and having no product. Vetting is the highest return-on-time activity in the entire curriculum.

Core concepts

The vetting checklist

Score every candidate. Do not skip lines because someone seems nice.

Identity and legitimacy

Capability

Commercial

Ethics and compliance

Relationship

Reading quotes

You will get a spread. Interpreting it:

  • One quote 30%+ below the others — assume a misunderstanding or a substitution. Go back line by line. Sometimes it’s a genuine capability advantage; usually it’s cheaper material, a different sole, or a trading company that will “clarify” the price after your deposit.
  • A quote with no breakdown — ask for a cost sheet. A factory that won’t break down its costing is either hiding margin (fine, but you can’t negotiate) or doesn’t have one (worse).
  • A quote that ignores your spec — they didn’t read the pack. This predicts everything about the relationship.

Payment terms and how to be safe

The industry standard for a new small customer is 30% deposit on order confirmation, 70% balance against copy of Bill of Lading (i.e. after goods are made and shipped, before you can collect them).

Your protections, in order of practicality:

  1. Pay the balance only after a successful third-party inspection. Write this into the PO. This is your single strongest lever and costs $200–400 for the inspection (Module 15).
  2. Alibaba Trade Assurance if you’re transacting there — genuine escrow-like protection, worth using for a first order even at slightly worse pricing.
  3. A small first order. The cheapest insurance is a limited downside.
  4. T/T (wire) to a verified company account only. Confirm bank details by video call, not email — email interception and invoice fraud is a real and common attack on small importers. If bank details “change” mid-transaction, treat it as fraud until proven otherwise by voice/video.
  5. Never accept a request to pay a personal account, a third-country account with an unrelated name, or via cryptocurrency.

What to actually negotiate

Price is the least productive thing to push on at 200 pairs. More valuable:

Ask Why it’s winnable
Development charge credited against bulk order Standard practice; just ask
Lower first-order MOQ as a trial Factories want new customers; frame it as the first of several orders
Payment against inspection Reasonable and professional
Free or cheap extra sample rounds Cheaper for them than a rejected bulk
Material sourcing help They buy better than you do
A named contact and a weekly update Costs them nothing, transforms your experience
Their technical suggestions to reduce cost They’ll often find 5–15%

Documents to have in place

  • NDA — modest protection in practice, but signals seriousness and costs nothing.
  • Manufacturing agreement / terms — covers ownership of tooling, patterns and lasts; confidentiality; no manufacture of your design for others; quality standards; remedies for defects; ownership of your IP. Even a simple two-page version is far better than nothing.
  • Purchase Order — the operative document. Must reference the tech pack version, quantities by size, price, Incoterm, delivery date, payment terms, inspection condition, packaging spec.
  • Code of conduct — your labour/environmental expectations. Adapt a published one; don’t write from scratch.

Templates and structure in Templates. For a manufacturing agreement involving real money, have a lawyer review it — Module 17 covers when legal spend is worth it.

Do this

1 · Score every candidate (6h). Build the checklist as a spreadsheet, one column per factory. Fill it in from their replies. Chase gaps.

2 · Video calls (6h). Do at least three live floor-walk calls. Prepare five technical questions from your tech pack’s section 17. Note who asks you questions back.

3 · Request their work (3h). Ask your top three to send a sample pair of something they’ve made. Pay shipping if needed. Physical evidence of their finishing quality is worth more than any certificate.

4 · Reference check (3h). Ask for one brand reference each and actually contact them.

5 · Terms package (5h). Prepare your NDA, code of conduct, PO template and draft manufacturing terms.

6 · Decide (2h). Write a selection memo: who, why, what the risks are, and what your fallback is if they fail. Have a named fallback.

Deliverable. A completed vetting scorecard for all candidates; notes from three floor-walk calls; at least one physical sample of a factory’s existing work; a signed NDA with your chosen factory; a selection memo with a named fallback.

Self-check

  • What is the single clearest scam indicator?
  • Why is a quote 30% below the others a warning rather than a win?
  • What are standard payment terms, and what’s your strongest protection?
  • Name five things more worth negotiating than unit price at 200 pairs.
  • What’s the best signal that a factory is actually engaged with your project?

Traps

Being charmed. Warmth and responsiveness are necessary but not sufficient. Run the checklist anyway.

Skipping the video floor-walk because it feels awkward to ask. It is completely normal and any legitimate factory will do it.

Email-only bank details. Business email compromise is one of the most common ways small importers lose their entire budget. Confirm by video.

No fallback. Factories go quiet, get busy with a bigger customer, or fail. Keep your number two warm.