Templates
Copy, adapt, use. Nothing here is legal advice; contracts should be reviewed by a lawyer before you sign one that involves real money.
First-contact email to a factory
Short, specific, and it makes clear you know what you’re asking for. Long enthusiastic emails get ignored.
Subject: Sneaker development enquiry — cemented low-top, 200–300 pairs
Hello,
My name is [name] and I’m developing a men’s low-top sneaker for a new brand based in [country].
Construction: cold cement, strobel lasted Bottom: open-mold cupsole, exploring mold [#] from [supplier] Upper: suede and canvas, approximately 10 pieces Sample size: US 9 / EU 42 First order: 200–300 pairs, one colourway, US 7–12 Target FOB: $30–38 Target delivery: [month]
I have a complete tech pack ready to share. Could you let me know:
- Do you produce this construction, and do you have or can you source this sole type?
- What is your MOQ per style and per colour?
- What is your development/sample charge and lead time?
- Would you consider a smaller first order to start a relationship?
Happy to arrange a call. Thank you for your time.
[name], [brand], [website/instagram], [phone]
First-contact email to a material or sole supplier
Subject: Catalogue request — open-mold cupsoles, small brand
Hello,
I’m developing a men’s low-top sneaker for a new brand in [country]. I’m looking for open-mold cupsole units in EU 40–46.
Could you send your current stock mold catalogue with mold numbers, available size ranges, materials, MOQs and indicative pricing at 200 and 500 pairs?
I’d also be grateful to know which assembly factories currently use your molds and would consider a small first order.
Thank you, [name], [brand]
Tech pack skeleton
Seventeen sections. Brand, style name, style code, version and date on every page.
01 Cover
02 Revision history
03 Line drawings — lateral, medial, top, bottom, front, back, dimensioned
04 Exploded / construction view
05 Construction spec — method, lasting, bonding, special processes
06 Last spec — name/number, supplier, sample size, matched sole
07 Sole spec — mold number, supplier, material, hardness, colour, stack, weight
08 Bill of Materials
09 Material callouts — numbered panels keyed to BOM
10 Colourways — one page each, all views
11 Stitching spec — seam type, rows, SPI, thread Tex and colour, per seam
12 Branding & artwork — files, sizes, positions from two datums, methods
13 Size & grading — size run, sample size, grade rules, size-specific specs
14 Labelling — origin, size, care, EU pictograms, barcode placement
15 Packaging — inner box, tissue, polybag, master carton, pack ratio, markings
16 Quality standards — defect list, AQL, required tests, acceptance criteria
17 Open questions — what you're asking the factory to advise on
BOM columns
Line # | Component | Placement | Material | Spec | Colour |
Supplier | Supplier ref | Consumption | Unit | Unit price |
Cost/pair | MOQ | Lead time | Notes
A first-shoe BOM has 35–60 lines. Include: every upper panel, every lining, backers, toe puff, counter, collar foam, tongue foam, strobel or board, sockliner, midsole, outsole, thread, adhesive, eyelets, laces, aglets, labels (brand, size, origin, care), box, tissue, polybag, master carton.
Cost sheet structure
Upper materials $
+ Bottom unit $
+ Components & trims $
+ Packaging $
= MATERIAL COST $ (target: 55–60% of FOB)
+ Direct labour $
+ Factory overhead $
= FACTORY COST $
+ Factory margin $
= FOB $
+ Freight $
+ Insurance $
+ Duty $
+ Broker / entry fees $
+ Inland freight $
= LANDED COST $
+ Fulfilment & payment fees $
+ Returns provision $
= DELIVERED COST $
Sample comment sheet
One row per issue. Photographs numbered and referenced. One PDF.
# | Photo ref | Location | Spec ref | Issue | Required correction | Priority
Priority values: Must fix / Should fix / Note only.
Factory vetting scorecard
Score each candidate 0–2 per line (0 = no/unknown, 1 = partial, 2 = confirmed).
IDENTITY
Business licence provided and name matches bank account
Physical address verified
Live video floor-walk completed
Bank account in company name (SCORE 0 = DISQUALIFY)
CAPABILITY
Produces this construction type
Can source/use the shortlisted sole
Can obtain the matched last
Capacity and line count disclosed
Relevant specialty processes in house
Verifiable brand reference provided
Physical sample of their work received
COMMERCIAL
MOQ in writing
Quote against a specific tech pack version
Development charge stated, credit terms clear
Lead times in writing
Payment terms acceptable
Ownership of patterns/lasts/dies agreed
ETHICS
Third-party audit report provided
Will sign code of conduct
Adhesive system disclosed
Will provide material test certificates
RELATIONSHIP
Named contact, <48h replies
Asks technical questions back
Purchase order — required contents
PO number and date
Buyer (legal entity) and Seller (legal entity)
Reference: tech pack version and date
Style name, style code, colourway
Quantities by size (the size curve)
Unit price and total
Incoterm (e.g. FOB [port])
Currency
Delivery date (ex-factory)
Payment terms
Inspection clause ← see below
Packaging spec reference
Labelling spec reference
Governing law
Inspection clause:
Balance payment of 70% is due against (a) a copy of the Bill of Lading and (b) a passed pre-shipment inspection report issued by [inspection company] at AQL 0/2.5/4.0, General Inspection Level II, conducted when production is at least 80% complete and packed. Buyer arranges and pays for the inspection. Goods failing inspection shall be reworked at Seller’s cost prior to shipment.
Manufacturing agreement — clauses to insist on
- Ownership of IP: designs, artwork, patterns, lasts, dies and molds developed for Buyer remain Buyer’s property.
- Exclusivity: Seller will not manufacture Buyer’s designs, or substantially similar products, for any third party.
- Confidentiality: surviving termination.
- Quality standard: goods to conform to the approved confirmation sample and the tech pack version referenced in the PO.
- Remedies: rework, replacement or refund for non-conforming goods; who pays return freight.
- Return of tooling and patterns on termination.
- Subcontracting: requires Buyer’s written consent.
- Compliance: Seller warrants compliance with applicable restricted-substance regulations and will provide certificates on request.
Have this reviewed by a lawyer.
Customer fit-feedback email (send 10–14 days after delivery)
Subject: How do they fit?
Hi [name],
Thanks for being one of the first people to buy a pair. I’m [name] — I designed these and I pack every order myself.
Three quick questions, and honest answers help more than kind ones:
- What size do you normally wear in [Brand A], [Brand B] and [Brand C]?
- How did ours fit — too small, true to size, or too large?
- Anything uncomfortable? Where exactly?
If the size isn’t right, reply and I’ll exchange them free.
[name]
Weekly build log entry
WEEK ## | dates
1. What I learned that contradicted what I assumed
2. Decisions made — and the option I rejected, and why
3. Open questions, and who I need to ask
4. Emails sent / replies received
5. Money spent this week / running total
6. What's blocking me